{"links": [{"rel": "self", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe"}, {"rel": "datasets", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets"}, {"rel": "records", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe/records"}, {"rel": "exports", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe/exports"}, {"rel": "facets", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe/facets"}, {"rel": "attachments", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe/attachments"}, {"rel": "reuses", "href": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe/reuses"}], "dataset": {"visibility": "domain", "dataset_id": "monitoring-capacites-echanges-swe", "dataset_uid": "da_f77gyb", "has_records": true, "features": ["timeserie", "analyze"], "attachments": [{"id": "description_frontieres_xlsx", "title": "Description_frontieres.xlsx", "mimetype": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet", "url": "https://odre.opendatasoft.com/api/v2/catalog/datasets/monitoring-capacites-echanges-swe/attachments/description_frontieres_xlsx"}], "alternative_exports": [], "data_visible": true, "fields": [{"name": "pas_de_temps_concerne_mtu", "description": "Le pas de temps sur lequel s'op\u00e9rait le calcul de capacit\u00e9", "annotations": {"timerangeFilter": true, "facetsort": "-alphanum", "facet": true, "timeserie_precision": "hour"}, "label": "Pas de temps concern\u00e9 [MTU]", "type": "datetime", "label_fr": "Pas de temps concern\u00e9 [MTU]", "label_en": "Pas de temps concern\u00e9 [MTU]", "description_fr": "Le pas de temps sur lequel s'op\u00e9rait le calcul de capacit\u00e9", "description_en": "Le pas de temps sur lequel s'op\u00e9rait le calcul de capacit\u00e9"}, {"name": "echeance", "description": "\u00c9ch\u00e9ance du calcul de capacit\u00e9. Ici J-1 ou Day Ahead en Anglais", "annotations": {}, "label": "Ech\u00e9ance", "type": "text", "label_fr": "Ech\u00e9ance", "label_en": "Ech\u00e9ance", "description_fr": "\u00c9ch\u00e9ance du calcul de capacit\u00e9. Ici J-1 ou Day Ahead en Anglais", "description_en": "\u00c9ch\u00e9ance du calcul de capacit\u00e9. Ici J-1 ou Day Ahead en Anglais"}, {"name": "sens_fr_es_ou_es_fr", "description": "FR>ES ou ES>FR pour SWE", "annotations": {}, "label": "Sens (FR>ES ou ES>FR)", "type": "text", "label_fr": "Sens (FR>ES ou ES>FR)", "label_en": "Sens (FR>ES ou ES>FR)", "description_fr": "FR>ES ou ES>FR pour SWE", "description_en": "FR>ES ou ES>FR pour SWE"}, {"name": "nom_de_la_cnec", "description": "CNEC pour Critical Network Element (CNE) & Contigency ; Ce sont ces \u00e9l\u00e9ments de r\u00e9seaux qui sont monitor\u00e9s", "annotations": {}, "label": "Nom de la CNEC", "type": "text", "label_fr": "Nom de la CNEC", "label_en": "Nom de la CNEC", "description_fr": "CNEC pour Critical Network Element (CNE) & Contigency ; Ce sont ces \u00e9l\u00e9ments de r\u00e9seaux qui sont monitor\u00e9s", "description_en": "CNEC pour Critical Network Element (CNE) & Contigency ; Ce sont ces \u00e9l\u00e9ments de r\u00e9seaux qui sont monitor\u00e9s"}, {"name": "code_eic_de_la_cne", "description": "Identification de la CNE dans le r\u00e9f\u00e9rentiel ENTSOE des Codes d'ouvrages d'interconnexion (Code \"T\")", "annotations": {}, "label": "Code EIC de la CNE", "type": "text", "label_fr": "Code EIC de la CNE", "label_en": "Code EIC de la CNE", "description_fr": "Identification de la CNE dans le r\u00e9f\u00e9rentiel ENTSOE des Codes d'ouvrages d'interconnexion (Code \"T\")", "description_en": "Identification de la CNE dans le r\u00e9f\u00e9rentiel ENTSOE des Codes d'ouvrages d'interconnexion (Code \"T\")"}, {"name": "code_eic_de_la_contingence", "description": "Identification de la Contingency (ou contingence) dans le r\u00e9f\u00e9rentiel ENTSOE des Codes d'ouvrages d'interconnexion (Code \"T\")", "annotations": {}, "label": "Code EIC de la contingence", "type": "text", "label_fr": "Code EIC de la contingence", "label_en": "Code EIC de la contingence", "description_fr": "Identification de la Contingency (ou contingence) dans le r\u00e9f\u00e9rentiel ENTSOE des Codes d'ouvrages d'interconnexion (Code \"T\")", "description_en": "Identification de la Contingency (ou contingence) dans le r\u00e9f\u00e9rentiel ENTSOE des Codes d'ouvrages d'interconnexion (Code \"T\")"}, {"name": "ccr", "description": "Zone de calcul de capacit\u00e9", "annotations": {}, "label": "CCR", "type": "text", "label_fr": "CCR", "label_en": "CCR", "description_fr": "Zone de calcul de capacit\u00e9", "description_en": "Zone de calcul de capacit\u00e9"}, {"name": "cnec_limitante", "description": "Bool\u00e9en - Sur CWE des \u00e9l\u00e9ments limitants et non limitants sont monitor\u00e9s.", "annotations": {}, "label": "CNEC limitante", "type": "text", "label_fr": "CNEC limitante", "label_en": "CNEC limitante", "description_fr": "Bool\u00e9en - Sur CWE des \u00e9l\u00e9ments limitants et non limitants sont monitor\u00e9s.", "description_en": "Bool\u00e9en - Sur CWE des \u00e9l\u00e9ments limitants et non limitants sont monitor\u00e9s."}, {"name": "ptdf_fr_es", "description": "Les sensibilit\u00e9s des CNEC aux \u00e9changes aux fronti\u00e8res pr\u00e9cis\u00e9es", "annotations": {}, "label": "PTDF FR>ES", "type": "double", "label_fr": "PTDF FR>ES", "label_en": "PTDF FR>ES", "description_fr": "Les sensibilit\u00e9s des CNEC aux \u00e9changes aux fronti\u00e8res pr\u00e9cis\u00e9es", "description_en": "Les sensibilit\u00e9s des CNEC aux \u00e9changes aux fronti\u00e8res pr\u00e9cis\u00e9es"}, {"name": "ptdf_es_pt", "description": "Les sensibilit\u00e9s des CNEC aux \u00e9changes aux fronti\u00e8res pr\u00e9cis\u00e9es", "annotations": {}, "label": "PTDF ES>PT", "type": "double", "label_fr": "PTDF ES>PT", "label_en": "PTDF ES>PT", "description_fr": "Les sensibilit\u00e9s des CNEC aux \u00e9changes aux fronti\u00e8res pr\u00e9cis\u00e9es", "description_en": "Les sensibilit\u00e9s des CNEC aux \u00e9changes aux fronti\u00e8res pr\u00e9cis\u00e9es"}, {"name": "fmax", "description": "Capacit\u00e9 Physique Maximale de la CNE consid\u00e9r\u00e9e (en MW)", "annotations": {}, "label": "Fmax", "type": "int", "label_fr": "Fmax", "label_en": "Fmax", "description_fr": "Capacit\u00e9 Physique Maximale de la CNE consid\u00e9r\u00e9e (en MW)", "description_en": "Capacit\u00e9 Physique Maximale de la CNE consid\u00e9r\u00e9e (en MW)"}, {"name": "ntc_fr_es", "description": "Les NTC des fronti\u00e8res de la zone SWE", "annotations": {}, "label": "NTC FR>ES", "type": "text", "label_fr": "NTC FR>ES", "label_en": "NTC FR>ES", "description_fr": "Les NTC des fronti\u00e8res de la zone SWE", "description_en": "Les NTC des fronti\u00e8res de la zone SWE"}, {"name": "ntc_es_fr", "description": "Les NTC des fronti\u00e8res de la zone SWE", "annotations": {}, "label": "NTC ES>FR", "type": "int", "label_fr": "NTC ES>FR", "label_en": "NTC ES>FR", "description_fr": "Les NTC des fronti\u00e8res de la zone SWE", "description_en": "Les NTC des fronti\u00e8res de la zone SWE"}, {"name": "ntc_es_pt", "description": "Les NTC des fronti\u00e8res de la zone SWE", "annotations": {}, "label": "NTC ES>PT", "type": "int", "label_fr": "NTC ES>PT", "label_en": "NTC ES>PT", "description_fr": "Les NTC des fronti\u00e8res de la zone SWE", "description_en": "Les NTC des fronti\u00e8res de la zone SWE"}, {"name": "ntc_pt_es", "description": "Les NTC des fronti\u00e8res de la zone SWE", "annotations": {}, "label": "NTC PT>ES", "type": "int", "label_fr": "NTC PT>ES", "label_en": "NTC PT>ES", "description_fr": "Les NTC des fronti\u00e8res de la zone SWE", "description_en": "Les NTC des fronti\u00e8res de la zone SWE"}, {"name": "mncc", "description": "Margin from Non Coordinated Capacity Calculation ; Calcul\u00e9e selon la recommandation ACER en prenant en compte les pays tiers", "annotations": {}, "label": "MNCC", "type": "double", "label_fr": "MNCC", "label_en": "MNCC", "description_fr": "Margin from Non Coordinated Capacity Calculation ; Calcul\u00e9e selon la recommandation ACER en prenant en compte les pays tiers", "description_en": "Margin from Non Coordinated Capacity Calculation ; Calcul\u00e9e selon la recommandation ACER en prenant en compte les pays tiers"}, {"name": "mccc", "description": "Margin from Coordinated Capacity Calculation ; Calcul\u00e9e selon la recommandation ACER en prenant en compte les pays tiers", "annotations": {}, "label": "MCCC", "type": "double", "label_fr": "MCCC", "label_en": "MCCC", "description_fr": "Margin from Coordinated Capacity Calculation ; Calcul\u00e9e selon la recommandation ACER en prenant en compte les pays tiers", "description_en": "Margin from Coordinated Capacity Calculation ; Calcul\u00e9e selon la recommandation ACER en prenant en compte les pays tiers"}, {"name": "maczt", "description": "Margin Available for Cross-Zonal Trade ; MACZT = MNCC +  MCCCC", "annotations": {}, "label": "MACZT", "type": "double", "label_fr": "MACZT", "label_en": "MACZT", "description_fr": "Margin Available for Cross-Zonal Trade ; MACZT = MNCC +  MCCCC", "description_en": "Margin Available for Cross-Zonal Trade ; MACZT = MNCC +  MCCCC"}, {"name": "convergence_des_prix_ccr", "description": "Bool\u00e9en indiquant si il y a une convergence des prix strict au sein de la CCR", "annotations": {}, "label": "Convergence des Prix CCR", "type": "text", "label_fr": "Convergence des Prix CCR", "label_en": "Convergence des Prix CCR", "description_fr": "Bool\u00e9en indiquant si il y a une convergence des prix strict au sein de la CCR", "description_en": "Bool\u00e9en indiquant si il y a une convergence des prix strict au sein de la CCR"}, {"name": "valeur_ajoutee_a_appliquer_le_cep_70", "description": "OUI si Convergence des prix = False & CNEC limitante = OUI, sinon NON", "annotations": {"facet": true, "disjunctive": true, "sortable": true}, "label": "Valeur ajout\u00e9e \u00e0 appliquer le CEP 70%", "type": "text", "label_fr": "Valeur ajout\u00e9e \u00e0 appliquer le CEP 70%", "label_en": "Valeur ajout\u00e9e \u00e0 appliquer le CEP 70%", "description_fr": "OUI si Convergence des prix = False & CNEC limitante = OUI, sinon NON", "description_en": "OUI si Convergence des prix = False & CNEC limitante = OUI, sinon NON"}, {"name": "maczt_superieure_a_70", "description": null, "annotations": {"sortable": true, "facet": true, "disjunctive": true}, "label": "MACZT sup\u00e9rieure \u00e0 70%", "type": "text", "label_fr": "MACZT sup\u00e9rieure \u00e0 70%", "label_en": "MACZT sup\u00e9rieure \u00e0 70%", "description_fr": null, "description_en": null}, {"name": "seuil_07", "description": "Seuil minimum de 0.7", "annotations": {"facetsort": "-count"}, "label": "0,7", "type": "double", "label_fr": "0,7", "label_en": "0,7", "description_fr": "Seuil minimum de 0.7", "description_en": "Seuil minimum de 0.7"}], "metas": {"semantic": {"rml_mapping": null, "classes": null, "properties": null}, "default": {"title": "Monitoring des capacit\u00e9s d'\u00e9changes aux fronti\u00e8res fran\u00e7aises de la r\u00e9gion Europe du Sud-Ouest en 2020", "title_fr": "Monitoring des capacit\u00e9s d'\u00e9changes aux fronti\u00e8res fran\u00e7aises de la r\u00e9gion Europe du Sud-Ouest en 2020", "title_en": "Monitoring des capacit\u00e9s d'\u00e9changes aux fronti\u00e8res fran\u00e7aises de la r\u00e9gion Europe du Sud-Ouest en 2020", "description": "<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>\u00ab\u00a0Monitoring\nPaquet Energie Propre 70%\u00a0\u00bb</span></b><b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'>\u00a0</span></b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Le r\u00e8glement europ\u00e9en\nde l\u2019\u00e9lectricit\u00e9, dans le cadre du Paquet Energie Propre adopt\u00e9 en 2019, exige\ndes GRT d\u2019\u00eatre en mesure de monitorer la capacit\u00e9 du r\u00e9seau devant \u00eatre mis \u00e0\ndisposition des \u00e9changes transfrontaliers en introduisant une cible ambitieuse\nde 70%. Selon la recommandation de l\u2019ACER (Agency for the Cooperation of Energy\nRegulators), ce monitoring s\u2019effectue, sur chaque pas de temps, \u00e0 la maille des\n\u00e9l\u00e9ments critiques de r\u00e9seaux qui sont fournis aux diff\u00e9rents calculs de\ncapacit\u00e9 pour les \u00e9changes aux fronti\u00e8res au sein de l\u2019Union Europ\u00e9enne.</span><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Dans ce cadre, et en\nattendant que ce monitoring soit effectu\u00e9 au niveau r\u00e9gional de chaque r\u00e9gion\nde calcul de capacit\u00e9, RTE et la CRE souhaitent mettre \u00e0 disposition de tous,\nles donn\u00e9es de monitoring qui sont produites sur le sujet au niveau fran\u00e7ais.\nCes donn\u00e9es seront partag\u00e9es sur une granularit\u00e9 semestrielle.<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>SWE, CWE et NIB sont\nles 3 r\u00e9gions de calcul de capacit\u00e9 au sein de l\u2019Union Europ\u00e9enne, auquel RTE\nparticipe (SWE pour la fronti\u00e8re avec l\u2019Espagne\u00a0; NIB pour la fronti\u00e8re avec\nl\u2019Italie\u00a0; CWE/CORE pour les fronti\u00e8res avec l'Allemagne et la Belgique).<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Pour les zones CWE/CORE (fronti\u00e8res avec l'Allemagne et la Belgique) et NIB (fronti\u00e8re avec l'Italie), retrouvez les\njeux de donn\u00e9es ci-dessous :<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-cwe/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion CORE/Europe du Centre-Ouest en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-nib/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion Italie Nord en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='color: rgb(31, 73, 125); font-family: \"Segoe UI\", sans-serif; font-size: 9.5pt;'>\u00a0La description\ndes fronti\u00e8res est en pi\u00e8ce jointe.</span></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><br></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b style=\"font-family: inherit; font-size: 0.833rem;\"><span style=\"color:#1F497D\">\u00ab\u00a0Monitoring Clean\nEnergy Package 70%\u00a0\u00bb</span></b><b style=\"font-family: inherit; font-size: 0.833rem;\">\u00a0</b><br></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">The european electricity regulation introduces in 2019, a minimum\nthreshold of 70% of the capacity to be made available for cross-border trade.\nIn the frame of this regulation, TSOs have to be able to monitor this network\ncapacity. According to ACER (Agency for the Cooperation of Energy Regulators)\nrecommendation, this monitoring takes place, on each Timestamp, on the critical\nnetwork element provided by TSOs to the capacity calculation project at\nEuropean Union level.<o:p></o:p></span></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">Within this framework, and until this monitoring will be carried out on\nthe regional level, RTE and CRE (Commission de R\u00e9gulation de l\u2019Energie) would\nlike to share, in Opendata, the dataset produced on the subject on French\nlevel.<o:p></o:p></span></p><p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n</p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">This dataset will be published on a half-year granularity.<o:p></o:p></span></p>", "description_fr": "<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>\u00ab\u00a0Monitoring\nPaquet Energie Propre 70%\u00a0\u00bb</span></b><b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'>\u00a0</span></b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Le r\u00e8glement europ\u00e9en\nde l\u2019\u00e9lectricit\u00e9, dans le cadre du Paquet Energie Propre adopt\u00e9 en 2019, exige\ndes GRT d\u2019\u00eatre en mesure de monitorer la capacit\u00e9 du r\u00e9seau devant \u00eatre mis \u00e0\ndisposition des \u00e9changes transfrontaliers en introduisant une cible ambitieuse\nde 70%. Selon la recommandation de l\u2019ACER (Agency for the Cooperation of Energy\nRegulators), ce monitoring s\u2019effectue, sur chaque pas de temps, \u00e0 la maille des\n\u00e9l\u00e9ments critiques de r\u00e9seaux qui sont fournis aux diff\u00e9rents calculs de\ncapacit\u00e9 pour les \u00e9changes aux fronti\u00e8res au sein de l\u2019Union Europ\u00e9enne.</span><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Dans ce cadre, et en\nattendant que ce monitoring soit effectu\u00e9 au niveau r\u00e9gional de chaque r\u00e9gion\nde calcul de capacit\u00e9, RTE et la CRE souhaitent mettre \u00e0 disposition de tous,\nles donn\u00e9es de monitoring qui sont produites sur le sujet au niveau fran\u00e7ais.\nCes donn\u00e9es seront partag\u00e9es sur une granularit\u00e9 semestrielle.<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>SWE, CWE et NIB sont\nles 3 r\u00e9gions de calcul de capacit\u00e9 au sein de l\u2019Union Europ\u00e9enne, auquel RTE\nparticipe (SWE pour la fronti\u00e8re avec l\u2019Espagne\u00a0; NIB pour la fronti\u00e8re avec\nl\u2019Italie\u00a0; CWE/CORE pour les fronti\u00e8res avec l'Allemagne et la Belgique).<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Pour les zones CWE/CORE (fronti\u00e8res avec l'Allemagne et la Belgique) et NIB (fronti\u00e8re avec l'Italie), retrouvez les\njeux de donn\u00e9es ci-dessous :<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-cwe/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion CORE/Europe du Centre-Ouest en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-nib/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion Italie Nord en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='color: rgb(31, 73, 125); font-family: \"Segoe UI\", sans-serif; font-size: 9.5pt;'>\u00a0La description\ndes fronti\u00e8res est en pi\u00e8ce jointe.</span></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><br></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b style=\"font-family: inherit; font-size: 0.833rem;\"><span style=\"color:#1F497D\">\u00ab\u00a0Monitoring Clean\nEnergy Package 70%\u00a0\u00bb</span></b><b style=\"font-family: inherit; font-size: 0.833rem;\">\u00a0</b><br></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">The european electricity regulation introduces in 2019, a minimum\nthreshold of 70% of the capacity to be made available for cross-border trade.\nIn the frame of this regulation, TSOs have to be able to monitor this network\ncapacity. According to ACER (Agency for the Cooperation of Energy Regulators)\nrecommendation, this monitoring takes place, on each Timestamp, on the critical\nnetwork element provided by TSOs to the capacity calculation project at\nEuropean Union level.<o:p></o:p></span></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">Within this framework, and until this monitoring will be carried out on\nthe regional level, RTE and CRE (Commission de R\u00e9gulation de l\u2019Energie) would\nlike to share, in Opendata, the dataset produced on the subject on French\nlevel.<o:p></o:p></span></p><p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n</p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">This dataset will be published on a half-year granularity.<o:p></o:p></span></p>", "description_en": "<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>\u00ab\u00a0Monitoring\nPaquet Energie Propre 70%\u00a0\u00bb</span></b><b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'>\u00a0</span></b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Le r\u00e8glement europ\u00e9en\nde l\u2019\u00e9lectricit\u00e9, dans le cadre du Paquet Energie Propre adopt\u00e9 en 2019, exige\ndes GRT d\u2019\u00eatre en mesure de monitorer la capacit\u00e9 du r\u00e9seau devant \u00eatre mis \u00e0\ndisposition des \u00e9changes transfrontaliers en introduisant une cible ambitieuse\nde 70%. Selon la recommandation de l\u2019ACER (Agency for the Cooperation of Energy\nRegulators), ce monitoring s\u2019effectue, sur chaque pas de temps, \u00e0 la maille des\n\u00e9l\u00e9ments critiques de r\u00e9seaux qui sont fournis aux diff\u00e9rents calculs de\ncapacit\u00e9 pour les \u00e9changes aux fronti\u00e8res au sein de l\u2019Union Europ\u00e9enne.</span><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Dans ce cadre, et en\nattendant que ce monitoring soit effectu\u00e9 au niveau r\u00e9gional de chaque r\u00e9gion\nde calcul de capacit\u00e9, RTE et la CRE souhaitent mettre \u00e0 disposition de tous,\nles donn\u00e9es de monitoring qui sont produites sur le sujet au niveau fran\u00e7ais.\nCes donn\u00e9es seront partag\u00e9es sur une granularit\u00e9 semestrielle.<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>SWE, CWE et NIB sont\nles 3 r\u00e9gions de calcul de capacit\u00e9 au sein de l\u2019Union Europ\u00e9enne, auquel RTE\nparticipe (SWE pour la fronti\u00e8re avec l\u2019Espagne\u00a0; NIB pour la fronti\u00e8re avec\nl\u2019Italie\u00a0; CWE/CORE pour les fronti\u00e8res avec l'Allemagne et la Belgique).<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Pour les zones CWE/CORE (fronti\u00e8res avec l'Allemagne et la Belgique) et NIB (fronti\u00e8re avec l'Italie), retrouvez les\njeux de donn\u00e9es ci-dessous :<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-cwe/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion CORE/Europe du Centre-Ouest en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-nib/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion Italie Nord en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='color: rgb(31, 73, 125); font-family: \"Segoe UI\", sans-serif; font-size: 9.5pt;'>\u00a0La description\ndes fronti\u00e8res est en pi\u00e8ce jointe.</span></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><br></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b style=\"font-family: inherit; font-size: 0.833rem;\"><span style=\"color:#1F497D\">\u00ab\u00a0Monitoring Clean\nEnergy Package 70%\u00a0\u00bb</span></b><b style=\"font-family: inherit; font-size: 0.833rem;\">\u00a0</b><br></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">The european electricity regulation introduces in 2019, a minimum\nthreshold of 70% of the capacity to be made available for cross-border trade.\nIn the frame of this regulation, TSOs have to be able to monitor this network\ncapacity. According to ACER (Agency for the Cooperation of Energy Regulators)\nrecommendation, this monitoring takes place, on each Timestamp, on the critical\nnetwork element provided by TSOs to the capacity calculation project at\nEuropean Union level.<o:p></o:p></span></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">Within this framework, and until this monitoring will be carried out on\nthe regional level, RTE and CRE (Commission de R\u00e9gulation de l\u2019Energie) would\nlike to share, in Opendata, the dataset produced on the subject on French\nlevel.<o:p></o:p></span></p><p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n</p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">This dataset will be published on a half-year granularity.<o:p></o:p></span></p>", "theme": ["March\u00e9s"], "theme_fr": ["March\u00e9s"], "theme_en": ["March\u00e9s"], "keyword": ["Interconnexion", "Calcul de capacit\u00e9", "CEP"], "keyword_fr": ["Interconnexion", "Calcul de capacit\u00e9", "CEP"], "keyword_en": ["Interconnexion", "Calcul de capacit\u00e9", "CEP"], "license": "Licence Ouverte v2.0 (Etalab)", "license_fr": "Licence Ouverte v2.0 (Etalab)", "license_en": "Licence Ouverte v2.0 (Etalab)", "license_url": "https://www.etalab.gouv.fr/wp-content/uploads/2017/04/ETALAB-Licence-Ouverte-v2.0.pdf", "license_url_fr": "https://www.etalab.gouv.fr/wp-content/uploads/2017/04/ETALAB-Licence-Ouverte-v2.0.pdf", "license_url_en": "https://www.etalab.gouv.fr/wp-content/uploads/2017/04/ETALAB-Licence-Ouverte-v2.0.pdf", "language": "fr", "metadata_languages": ["fr"], "timezone": ["Europe/Paris"], "modified": "2021-04-26T07:35:25+00:00", "modified_updates_on_metadata_change": false, "modified_updates_on_data_change": false, "data_processed": "2021-06-04T07:44:16+00:00", "metadata_processed": "2024-12-18T20:08:14.700000+00:00", "geographic_reference": ["world_fr"], "geographic_reference_auto": true, "territory": ["France"], "geometry_types": null, "bbox": null, "publisher": "RTE", "publisher_fr": "RTE", "publisher_en": "RTE", "references": null, "records_count": 11123, "attributions": null, "source_domain": null, "source_domain_title": null, "source_domain_address": null, "source_dataset": null, "shared_catalog": null, "federated": false, "parent_domain": "rte", "update_frequency": null}, "custom": {"maille-geographique": ["Europe"], "pas-temporel": ["Horaire"], "profondeur-dhistorique": "2020", "reseaux": ["Transport"], "energie": ["\u00c9lectricit\u00e9"], "frequence-de-mise-a-jour": "Semestrielle", "version": null, "secteur-dactivite": null}, "dcat": {"created": null, "issued": null, "creator": null, "contributor": null, "contact_name": null, "contact_email": null, "accrualperiodicity": "semiannual", "spatial": null, "temporal": null, "granularity": null, "dataquality": null, "publisher_type": null, "conforms_to": null, "temporal_coverage_start": null, "temporal_coverage_end": null, "accessRights": null, "relation": null}, "dcat_ap": {"title": "Monitoring des capacit\u00e9s d'\u00e9changes aux fronti\u00e8res fran\u00e7aises de la r\u00e9gion Europe du Sud-Ouest en 2020", "description": "<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>\u00ab\u00a0Monitoring\nPaquet Energie Propre 70%\u00a0\u00bb</span></b><b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'>\u00a0</span></b><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Le r\u00e8glement europ\u00e9en\nde l\u2019\u00e9lectricit\u00e9, dans le cadre du Paquet Energie Propre adopt\u00e9 en 2019, exige\ndes GRT d\u2019\u00eatre en mesure de monitorer la capacit\u00e9 du r\u00e9seau devant \u00eatre mis \u00e0\ndisposition des \u00e9changes transfrontaliers en introduisant une cible ambitieuse\nde 70%. Selon la recommandation de l\u2019ACER (Agency for the Cooperation of Energy\nRegulators), ce monitoring s\u2019effectue, sur chaque pas de temps, \u00e0 la maille des\n\u00e9l\u00e9ments critiques de r\u00e9seaux qui sont fournis aux diff\u00e9rents calculs de\ncapacit\u00e9 pour les \u00e9changes aux fronti\u00e8res au sein de l\u2019Union Europ\u00e9enne.</span><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Dans ce cadre, et en\nattendant que ce monitoring soit effectu\u00e9 au niveau r\u00e9gional de chaque r\u00e9gion\nde calcul de capacit\u00e9, RTE et la CRE souhaitent mettre \u00e0 disposition de tous,\nles donn\u00e9es de monitoring qui sont produites sur le sujet au niveau fran\u00e7ais.\nCes donn\u00e9es seront partag\u00e9es sur une granularit\u00e9 semestrielle.<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>SWE, CWE et NIB sont\nles 3 r\u00e9gions de calcul de capacit\u00e9 au sein de l\u2019Union Europ\u00e9enne, auquel RTE\nparticipe (SWE pour la fronti\u00e8re avec l\u2019Espagne\u00a0; NIB pour la fronti\u00e8re avec\nl\u2019Italie\u00a0; CWE/CORE pour les fronti\u00e8res avec l'Allemagne et la Belgique).<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size:9.5pt;font-family:\"Segoe UI\",sans-serif;mso-fareast-font-family:\n\"Times New Roman\";color:#1F497D;mso-fareast-language:FR'>Pour les zones CWE/CORE (fronti\u00e8res avec l'Allemagne et la Belgique) et NIB (fronti\u00e8re avec l'Italie), retrouvez les\njeux de donn\u00e9es ci-dessous :<o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-cwe/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion CORE/Europe du Centre-Ouest en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='font-size: 9.5pt; font-family: \"Segoe UI\", sans-serif;'><a href=\"https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-nib/information/\"><span style='font-family:\"inherit\",serif;color:#337AB7'>Monitoring des capacit\u00e9s\nd'\u00e9changes aux fronti\u00e8res de la r\u00e9gion Italie Nord en 2020 \u2014 Open Data R\u00e9seaux \u00c9nergies\n(ODR\u00c9) (reseaux-energies.fr)</span></a><o:p></o:p></span></p>\n\n<p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><span style='color: rgb(31, 73, 125); font-family: \"Segoe UI\", sans-serif; font-size: 9.5pt;'>\u00a0La description\ndes fronti\u00e8res est en pi\u00e8ce jointe.</span></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><br></p><p class=\"MsoNormal\" style=\"margin-bottom:7.5pt;line-height:normal\"><b style=\"font-family: inherit; font-size: 0.833rem;\"><span style=\"color:#1F497D\">\u00ab\u00a0Monitoring Clean\nEnergy Package 70%\u00a0\u00bb</span></b><b style=\"font-family: inherit; font-size: 0.833rem;\">\u00a0</b><br></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">The european electricity regulation introduces in 2019, a minimum\nthreshold of 70% of the capacity to be made available for cross-border trade.\nIn the frame of this regulation, TSOs have to be able to monitor this network\ncapacity. According to ACER (Agency for the Cooperation of Energy Regulators)\nrecommendation, this monitoring takes place, on each Timestamp, on the critical\nnetwork element provided by TSOs to the capacity calculation project at\nEuropean Union level.<o:p></o:p></span></p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">Within this framework, and until this monitoring will be carried out on\nthe regional level, RTE and CRE (Commission de R\u00e9gulation de l\u2019Energie) would\nlike to share, in Opendata, the dataset produced on the subject on French\nlevel.<o:p></o:p></span></p><p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n</p><p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color:#1F497D;mso-ansi-language:\nEN-US\">This dataset will be published on a half-year granularity.<o:p></o:p></span></p>", "theme": null, "keyword": ["Interconnexion", "Calcul de capacit\u00e9", "CEP"], "contact_name": null, "contact_email": null, "publisher_name": "RTE", "publisher_type": null, "spatial_bbox": null, "spatial_centroid": null, "temporal_startDate": null, "temporal_endDate": null, "accrualPeriodicity": null}}}}